Component of TIIS Certificate

  • The certificate of approval is prepared and issued to the applicant in accordance with Form No. 8 as defined in Article 9 of the Regulations for Machine Regulations (Type Certificate of Type Approval).
  • The certificate will be accompanied by a separate sheet if the content does not fit in the form.
  • The certificate shown in the table below is attached to the certificate, and constitutes the entire acceptance document.

Written With or without attachment
Pass certificate Will be attached.
Attached sheet When there is a statement of “according to the separate sheet” in the certificate of approval
List of identical models When the model or rating has the same model
List of attached drawings Will be attached.
Summary book of manufacturing inspection facilities It is attached except for single item handling.
Drawing Will be attached.